US 80 over RICHLAND CREEK TRIB

6.2 MI E OF TALBOTTON · County 263, Georgia · Built 1938 · 3 Lanes · 460 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000026300060
Year Built
1938
Reconstructed
1994
Length
7.9 m (25.9 ft)
Max Span
2.4 m
Lanes
3
Daily Traffic
460
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$129,000
Total Project Cost
$194,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.