NEW POINT CHURCH R over MUCKALOOCHEE CREEK

4.5 MI E OF PLAINS · County 261, Georgia · Built 2017 · 2 Lanes · 158 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000026150610
Year Built
2017
Length
24.4 m (80.1 ft)
Max Span
6.1 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
158
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$7,104,000
Total Project Cost
$10,656,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.