CHULI ROAD over TOWALIGA RIVER TRIB

8 MI NE OF GRIFFIN · County 255, Georgia · Built 1970 · 2 Lanes · 158 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000025550180
Year Built
1970
Length
10.4 m (34.1 ft)
Max Span
5.2 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
158
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$133,000
Total Project Cost
$199,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.