I-75 over TOWALIGA RIVER

8.5 MI NE OF GRIFFIN · County 255, Georgia · Built 1966 · 6 Lanes · 95,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000025500270
Year Built
1966
Reconstructed
1985
Length
72.2 m (236.9 ft)
Max Span
24.1 m
Width
42.3 m (138.8 ft)
Lanes
6
Daily Traffic
95,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,936,000
Total Project Cost
$2,904,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.