ELLIS ROAD over SR 3 (US 19)

IN GRIFFIN · County 255, Georgia · Built 1968 · 2 Lanes · 5,050 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000025500180
Year Built
1968
Length
57.3 m (188 ft)
Max Span
18.3 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
5,050
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$735,000
Total Project Cost
$1,102,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.