US 19 SR 3 NBL over M-2508 W POPLAR STREET
IN GRIFFIN · County 255, Georgia · Built 1968 · 2 Lanes · 29,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.242922, -84.295958
This bridge is in worse condition than 54% of bridges in County 255. The average bridge in Georgia is 0 years old; this one is 58 years old.
Nearby Bridges
US 19 SR 3 SBL over M-2508 W POPLAR STREET
Built 1968
SR 16 over SR 3 (US 19)
Built 2015
US 19 SR 3 NBL over SR 362
Built 1967
US 19 SR 3 SBL over SR 362
Built 1967
US 19 SR 3 GRIFF over SHOAL CREEK
Built 1968
SR 92 over SHOAL CREEK TRIB
Built 2005
SR 16 over SHOAL CREEK
Built 1960
PINE HILL ROAD over SHOAL CREEK TRIB
Built 1956
ELLIS ROAD over SR 3 (US 19)
Built 1968
US 19 SR 92 SB R over SR 3 (US 19)
Built 1956
Bridge Details
- Structure #
- 000000025500080
- Year Built
- 1968
- Length
- 35.1 m (115.2 ft)
- Max Span
- 13.7 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 29,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $449,000
- Total Project Cost
- $674,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.