US 19 SR 3 NBL over M-2508 W POPLAR STREET

IN GRIFFIN · County 255, Georgia · Built 1968 · 2 Lanes · 29,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000025500080
Year Built
1968
Length
35.1 m (115.2 ft)
Max Span
13.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
29,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$449,000
Total Project Cost
$674,000