SR 45 over DRY CREEK

2.7 MI NORTH OF IRON CITY · County 253, Georgia · Built 2022 · 2 Lanes · 550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000025350320
Year Built
2022
Length
48.8 m (160.1 ft)
Max Span
13.7 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
550
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,208,000
Total Project Cost
$21,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.