ED MILLER ROAD over DRY CREEK

2.7 MI. N. OF IRON CITY · County 253, Georgia · Built 2002 · 2 Lanes · 158 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000025350250
Year Built
2002
Length
24.4 m (80.1 ft)
Max Span
6.1 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
158
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$313,000
Total Project Cost
$469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.