CR 226 over FISHPOND DRAIN

11.5 MILES SOUTH OF IRON · County 253, Georgia · Built 2013 · 2 Lanes · 110 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000025350300
Year Built
2013
Length
121.9 m (399.9 ft)
Max Span
12.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
110
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$17,316,000
Total Project Cost
$25,974,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.