LANDING ROAD over FISHPOND DRAIN

9.1 MI S OF IRON CITY · County 253, Georgia · Built 1973 · 2 Lanes · 210 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000025350150
Year Built
1973
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
210
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.