8TH STREET over HAWKS GULLY

12.7 MI NE OF HEPHIZIBAH · County 245, Georgia · Built 2005 · 2 Lanes · 1,620 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000024550710
Year Built
2005
Length
20.7 m (67.9 ft)
Max Span
20.7 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
1,620
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$266,000
Total Project Cost
$399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.