I-520 (WBL) over CSX RAILROAD
13 MI NE OF HEPHZIBAH · County 245, Georgia · Built 1998 · 3 Lanes · 92,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.449086, -81.934692
This bridge is in worse condition than 21.9% of bridges in County 245. The average bridge in Georgia is 0 years old; this one is 28 years old.
Nearby Bridges
I-520 (EBL) over CSX RAILROAD
Built 1998
COL-NITROGEN ROAD over CSX RAILROAD (633709S)
Built 1983
I-520 (WBL) over LANEY WALKER BLVD.
Built 2004
I-520 (EBL) over LANEY WALKER BLVD.
Built 2004
I-520 over SANDBAR FERRY ROAD
Built 2004
LOVERS LANE over BOBBY JONES EXPRESSWAY
Built 1998
I-520 over SAVANNAH RIVER
Built 2004
I-520 over SAVANNAH RIVER
Built 2004
COLUMBIA NITROGEN over UNKNOWN CREEK
Built 2001
I-520 (EBL) over MERRY BROS. (PRIVATE)
Built 1998
Bridge Details
- Structure #
- 000000024550570
- Year Built
- 1998
- Length
- 94.5 m (310 ft)
- Max Span
- 28.3 m
- Width
- 19 m (62.3 ft)
- Lanes
- 3
- Daily Traffic
- 92,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,542,000
- Total Project Cost
- $2,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.