MOLLY POND ROAD over OATS CREEK

11.1 MI NE OF HEPHZIBAH · County 245, Georgia · Built 1992 · 2 Lanes · 800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024550300
Year Built
1992
Length
30.5 m (100.1 ft)
Max Span
6.1 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
800
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$391,000
Total Project Cost
$586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.