SR 121 - US 25 over SPIRIT CREEK

3.4 MI NE OF HEPHZIBAH · County 245, Georgia · Built 1987 · 5 Lanes · 20,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024501140
Year Built
1987
Length
24.4 m (80.1 ft)
Max Span
12.2 m
Width
26 m (85.3 ft)
Lanes
5
Daily Traffic
20,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$568,000
Total Project Cost
$852,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.