NORTH LEG over CSX RAILROAD

10.2 MI N OF HEPHIZIBAH · County 245, Georgia · Built 1953 · 2 Lanes · 10,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000024500820
Year Built
1953
Length
52.7 m (172.9 ft)
Max Span
11.6 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
10,800
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$676,000
Total Project Cost
$1,014,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.