SR 15 over ALABAHA RIVER

2 MI N OF BLACKSHEAR · County 229, Georgia · Built 1996 · 2 Lanes · 3,290 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000022900490
Year Built
1996
Length
249.9 m (819.9 ft)
Max Span
27.4 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
3,290
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,204,000
Total Project Cost
$4,806,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.