SR 15 over ALABAHA RIVER O/F

2 MI N OF BLACKSHEAR · County 229, Georgia · Built 1996 · 2 Lanes · 3,290 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000022900480
Year Built
1996
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
3,290
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.