SUMMIT DRIVE over SANDY RUN CREEK

3.5 MI S OF BYRON · County 225, Georgia · Built 1980 · 2 Lanes · 270 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000022550130
Year Built
1980
Length
14.9 m (48.9 ft)
Max Span
1.2 m
Lanes
2
Daily Traffic
270
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$191,000
Total Project Cost
$287,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.