BROWN AVENUE over CS 550 BRAGG SMITH ST.

MID. COLUMBUS C.L. · County 215, Georgia · Built 2014 · 2 Lanes · 7,760 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000021550740
Year Built
2014
Length
22.6 m (74.1 ft)
Max Span
22.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
7,760
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$272,690,000
Total Project Cost
$409,035,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.