SR 520 (US 27) over WERACOBA CREEK

3.6 MI N OF SR1-SW COLUMB · County 215, Georgia · Built 1944 · 6 Lanes · 29,600 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000021500070
Year Built
1944
Reconstructed
1972
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
6
Daily Traffic
29,600
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$261,000
Total Project Cost
$392,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.