US 27 ALT./ SR 85 over WALKING TRAIL

2.7 MI NE JCT SR 1-E COLU · County 215, Georgia · Built 1961 · 2 Lanes · 6,820 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000021500280
Year Built
1961
Length
57.9 m (190 ft)
Max Span
15.2 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
6,820
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$742,000
Total Project Cost
$1,114,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.