US 27 ALT. over COOPER CREEK

NORTHEAST COLUMBUS · County 215, Georgia · Built 1961 · 4 Lanes · 22,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000021500270
Year Built
1961
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
4
Daily Traffic
22,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$193,000
Total Project Cost
$290,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.