CCC CAMP ROAD over DILL CREEK

7 MI SE OF CRANDALL · County 213, Georgia · Built 2011 · 2 Lanes · 290 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
000000021350440
Year Built
2011
Length
10.1 m (33.1 ft)
Max Span
10.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
290
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$129,000
Total Project Cost
$193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.