CCC CAMP ROAD over MUSKRAT CREEK

3 MI E OF ETON · County 213, Georgia · Built 1970 · 2 Lanes · 850 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000021300410
Year Built
1970
Length
8.2 m (26.9 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
850
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.