US 411 SR 61 over MILL CREEK

IN SOUTH ETON · County 213, Georgia · Built 1950 · 5 Lanes · 12,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000021300160
Year Built
1950
Reconstructed
1987
Length
64 m (210 ft)
Max Span
9.1 m
Width
24.2 m (79.4 ft)
Lanes
5
Daily Traffic
12,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,492,000
Total Project Cost
$2,238,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.