US 411 SR 61/SR 2 over MILL CREEK OVERFLOW

0.8 MI S OF ETON · County 213, Georgia · Built 1950 · 5 Lanes · 12,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000021300150
Year Built
1950
Reconstructed
1987
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
24.2 m (79.4 ft)
Lanes
5
Daily Traffic
12,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$639,000
Total Project Cost
$959,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.