SR 83 over TOWALIGA RIVER

7 MI NE OF FORSYTH · County 207, Georgia · Built 2019 · 2 Lanes · 2,490 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000020750550
Year Built
2019
Length
100.6 m (330.1 ft)
Max Span
38.1 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
2,490
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$29,304,000
Total Project Cost
$439,565,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.