US 23 SR 87 over TOWALIGA RIVER

9 MI NE OF FORSYTH · County 207, Georgia · Built 1994 · 2 Lanes · 3,310 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000020700730
Year Built
1994
Length
92.7 m (304.1 ft)
Max Span
18.6 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
3,310
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,188,000
Total Project Cost
$1,782,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.