LAKE PLEASANT CH R over LOST CREEK

APP 3 MI NNE OF COTTON · County 205, Georgia · Built 1992 · 2 Lanes · 10 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000020550300
Year Built
1992
Length
19.2 m (63 ft)
Max Span
2.7 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
10
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$246,000
Total Project Cost
$369,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.