EUBANKS ROAD over LOST CREEK TRIB

APP 3 MI N OF COTTON · County 205, Georgia · Built 1992 · 2 Lanes · 10 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000020550140
Year Built
1992
Length
16.8 m (55.1 ft)
Max Span
3 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
10
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$215,000
Total Project Cost
$322,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.