EVERGREEN ROAD over BIG SLOUGH

APP 3 MI SW OF CAMILLA · County 205, Georgia · Built 1979 · 2 Lanes · 110 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000020550010
Year Built
1979
Length
54.9 m (180.1 ft)
Max Span
6.1 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
110
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$703,000
Total Project Cost
$1,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.