SR 97 over BIG SLOUGH

APP 3 MI S OF CAMILLA · County 205, Georgia · Built 1974 · 2 Lanes · 1,960 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000020500300
Year Built
1974
Length
73.2 m (240.2 ft)
Max Span
9.1 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
1,960
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.