TUTON ROAD over WETHINGTON SLOUGH

4.1 MI S OF BACONTON · County 205, Georgia · Built 1966 · 2 Lanes · 1,153 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000020500700
Year Built
1966
Reconstructed
2002
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
1,153
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$234,000
Total Project Cost
$352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.