US 19- SR 300 NBL over RACCOON CREEK OVERFLOW

APP 5 MILES NORTH OF CAMI · County 205, Georgia · Built 1980 · 2 Lanes · 10,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000020500560
Year Built
1980
Length
32.9 m (107.9 ft)
Max Span
11 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
10,700
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$422,000
Total Project Cost
$633,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.