NEBULA ROAD over PIGEON CREEK
0.2 MI W OF MANCHESTER CL · County 199, Georgia · Built 1970 · 2 Lanes · 350 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
32.8525, -84.644472
This bridge is in worse condition than 72.2% of bridges in County 199. The average bridge in Georgia is 0 years old; this one is 56 years old.
Nearby Bridges
US 27 ALT./ SR. 41 over PIGEON CREEK
Built 1953
US 27 ALT./ SR. 41 over CSX RAILROAD
Built 1953
US 27 ALT./ SR. 41 over CSX RAILROAD
Built 1953
SR 85 over CSX RAILROAD
Built 2015
SR 85 SPUR over CSX RAILROAD
Built 1969
SR 85 over CS 23023-00010E
Built 2022
SR 190 over NS RR (ABANDON)
Built 2024
SHILOH ROAD over LAZER CREEK TRIB
Built 1960
PIGEON CREEK ROAD over PIGEON CREEK
Built 1980
SR 85E- US 27 ALT. over LAZAR CREEK
Built 1991
Bridge Details
- Structure #
- 000000019950320
- Year Built
- 1970
- Length
- 24.4 m (80.1 ft)
- Max Span
- 4.9 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 350
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $313,000
- Total Project Cost
- $469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.