SR 85 SPUR over CSX RAILROAD

IN MANCHESTER · County 199, Georgia · Built 1969 · 2 Lanes · 4,210 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019900360
Year Built
1969
Length
42.1 m (138.1 ft)
Max Span
15.8 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
4,210
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$539,000
Total Project Cost
$809,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.