SR 90 over CSX RAILROAD

3.5 MI SE OF IDEAL · County 193, Georgia · Built 2015 · 2 Lanes · 1,170 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000019350630
Year Built
2015
Length
81.7 m (268 ft)
Max Span
36.9 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
1,170
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$23,828,000
Total Project Cost
$35,742,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.