SR 90 over CSX RR-CEDAR CR-CR 281

IDEAL CITY LIMITS · County 193, Georgia · Built 1998 · 2 Lanes · 790 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019350510
Year Built
1998
Length
127.1 m (417 ft)
Max Span
36.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
790
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,629,000
Total Project Cost
$2,444,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.