SR 49 over NS RAILROAD

6 MI SW OF OGLETHORPE · County 193, Georgia · Built 1990 · 2 Lanes · 4,650 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000019300500
Year Built
1990
Length
69.2 m (227 ft)
Max Span
23.8 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
4,650
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$887,000
Total Project Cost
$1,330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.