SR 49 over CAMP CREEK

5 MI S.W. OGLETHORPE · County 193, Georgia · Built 1963 · 2 Lanes · 4,650 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019300090
Year Built
1963
Length
45.7 m (149.9 ft)
Max Span
9.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
4,650
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$586,000
Total Project Cost
$879,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.