I-95 (SBL) over SOUTH NEWPORT RIVER

18 MI N OF DARIEN · County 191, Georgia · Built 1970 · 3 Lanes · 61,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019100380
Year Built
1970
Reconstructed
2004
Length
230.4 m (755.9 ft)
Max Span
17.7 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
61,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,759,000
Total Project Cost
$5,639,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.