I-95 (SBL) over BULL TOWN SWAMP

5 MI S OF RICEBORO · County 179, Georgia · Built 1972 · 3 Lanes · 60,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000017900350
Year Built
1972
Reconstructed
2004
Length
46.3 m (151.9 ft)
Max Span
11.6 m
Width
24.2 m (79.4 ft)
Lanes
3
Daily Traffic
60,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$756,000
Total Project Cost
$1,134,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.