I-95 (NBL) over YOUNGS SWAMP CREEK

11 MI N OF DARIEN · County 191, Georgia · Built 1970 · 3 Lanes · 59,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019100340
Year Built
1970
Reconstructed
2008
Length
76.8 m (252 ft)
Max Span
11 m
Width
32.3 m (106 ft)
Lanes
3
Daily Traffic
59,700
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,253,000
Total Project Cost
$1,880,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.