SR 57 over JACKIE CAMP SWAMP

3 MI W OF JCT I-95 · County 191, Georgia · Built 1950 · 2 Lanes · 3,180 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019100160
Year Built
1950
Reconstructed
1977
Length
49.4 m (162.1 ft)
Max Span
8.2 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
3,180
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$633,000
Total Project Cost
$949,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.