I-95 (SBL) over KINGS SWAMP

4 MI N OF DARIEN · County 191, Georgia · Built 1967 · 3 Lanes · 57,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019100320
Year Built
1967
Reconstructed
2008
Length
29.3 m (96.1 ft)
Max Span
9.8 m
Width
24.3 m (79.7 ft)
Lanes
3
Daily Traffic
57,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$477,000
Total Project Cost
$716,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.