I-95 (NBL) over CATHEAD RIVER

1 MI W OF DARIEN · County 191, Georgia · Built 1970 · 4 Lanes · 62,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019100290
Year Built
1970
Length
187.1 m (613.8 ft)
Max Span
19.5 m
Width
24.2 m (79.4 ft)
Lanes
4
Daily Traffic
62,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,708,000
Total Project Cost
$5,561,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.