I-95 (SBL) over BUTLER RIVER

3 MI SW OF DARIEN · County 191, Georgia · Built 1970 · 4 Lanes · 57,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000019100260
Year Built
1970
Reconstructed
2008
Length
643.7 m (2111.9 ft)
Max Span
19.5 m
Width
24.2 m (79.4 ft)
Lanes
4
Daily Traffic
57,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,753,000
Total Project Cost
$19,130,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.