US 78 SR 10 over SWEETWATER CREEK

3.6 MI SE OF THOMSON · County 189, Georgia · Built 2023 · 2 Lanes · 4,510 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000018950340
Year Built
2023
Length
31.4 m (103 ft)
Max Span
31.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
4,510
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.