US 78 SR 10 SR 1 over TEMPLE RD - CSX RR

0.8 MI NE OF THOMSON · County 189, Georgia · Built 2009 · 2 Lanes · 4,150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000018950210
Year Built
2009
Length
86.6 m (284.1 ft)
Max Span
43 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
4,150
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,110,000
Total Project Cost
$1,664,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.