HICKORY CHRUCH RD over MUD CREEK

4.4 MI NE OF LAKE PARK · County 185, Georgia · Built 2020 · 2 Lanes · 710 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000018550950
Year Built
2020
Length
79.2 m (259.8 ft)
Max Span
6.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
710
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$23,088,000
Total Project Cost
$34,632,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.